technology

Repsol bets big on green hydrogen in tarragona with €104m boost

Repsol is doubling down on its decarbonization strategy in Tarragona, Spain, with a major new project focused on green hydrogen production. The company will construct a large electrolyzer with a capacity of 150 MW, poised to generate green hydrogen for industrial processes, mobility, and integration into Europe’s hydrogen network.

T-hynet project to cut carbon emissions

The T-HYNET project, slated for the Constantí municipality within the Tarragona refinery, will produce hydrogen using renewable electricity. This initiative is projected to reduce carbon dioxide emissions by approximately 251,000 tons annually, exceeding the estimated reductions from Repsol's existing Ecoplanta waste-to-fuel facility.

The electrolyzer, alimented by renewable energy from the grid, will also utilize recycled water from AITSA, minimizing pressure on conventional water resources. Adiabatic cooling systems will further reduce water consumption by up to 95% compared to traditional industrial cooling methods. The project received a favorable environmental impact declaration in June 2025 and secured a €104.2 million public funding grant from the European Innovation Fund's Hydrogen Valley program.

The hydrogen produced will feed into industrial processes within the Tarragona complex, power new mobility solutions, and eventually connect to the European Hydrogen Backbone. This aligns with the European Union’s ambitious targets for decarbonizing maritime transport, aiming for a 40% reduction in carbon intensity by 2030 and 75% by 2050. Renewable methanol, derived from urban waste by the Ecoplanta, will also play a crucial role.

Ecoplanta: transforming waste into renewable fuels

Ecoplanta: transforming waste into renewable fuels

The Ecoplanta, a separate but complementary project with over €800 million investment, will gasify urban waste to produce 240,000 tons of renewable fuels and circular products annually. During construction, the plant is expected to create around 2,800 jobs, with 340 direct and indirect high-skilled positions during operation. The European Commission estimates the Ecoplanta will prevent 3.4 million tons of greenhouse gas emissions over its first decade.

Together, the Ecoplanta and the new electrolyzer solidify Repsol’s commitment to a multi-energy future. The company aims to produce 1.5 to 1.7 million tons of renewable fuels in 2027, escalating to 2.7 million tons annually by 2030, encompassing renewable hydrogen and biomethane. Repsol isn’t just investing in green tech; they’re betting on a future where industrial zones become key players in the global energy transition. This isn’t just about reducing emissions; it’s about building a new industrial ecosystem.

The project's planned operational start in 2028 is coordinated with the Ecoplanta's initial operations, a strategic alignment that underscores Repsol's comprehensive approach to sustainable energy.

Repsol's move isn't a fleeting trend; it’s a calculated bet on the future of energy. The company's investments are not just reshaping its Tarragona complex but are also recalibrating the region's economic landscape.